Step 1 - Configure managed systems
- Using SAP Gui
Admin transaction
start step1. Modify Managed systems
:
For each managed system defined by column System ID
provide respective RFC destination
(see how to prepare it. Leave the rest of the fields - they are updated automatically on Connection status check.
- Check connection status
Using same SAP Gui Admin transaction
start step 2. Connection status check Modify Managed systems
:
For correctly configured systems it should show green light in column status
as shown on below screenshot: